- Operating capacity
- 434 MW
- Units
- 3
- Online since
- 2012
- Age
- 14 yrs
Blue Summit wind farm is a 434 MW wind power plant in Wilbarger County, Texas, United States.
It has 3 units, which came online between 2012 and 2019. It is owned mainly by NextEra Energy Inc. By capacity it is the 50th largest of 1,465 operating wind plants in the United States.
- Owner
- NextEra Energy Inc
NextEra Energy Inc [100%]
- Coordinates
- 34.2054, -99.4781 (exact)
- GEM plant ID
- L100000906972
Plant details
How this wind plant is built and run.
- Installation
- Onshore
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Units
3 units at this site.
| Unit | Capacity | Status | Start | Technology |
|---|---|---|---|---|
| 1.0 | 135 MW | Operating | 2012 | Onshore |
| 2.0 | 99 MW | Operating | 2018 | Onshore |
| 3.0 | 200 MW | Operating | 2019 | Onshore |
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 369 GWh
- Capacity factor
- 10%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | — | — | NO-ESTIMATION |
| 2014 | — | — | — | NO-ESTIMATION |
| 2015 | — | — | — | NO-ESTIMATION |
| 2016 | — | — | — | NO-ESTIMATION |
| 2017 | — | 291.91 | 8% | CAPACITY-FACTOR-V1 |
| 2018 | — | — | — | — |
| 2019 | 369.33 | — | 10% | — |
How it compares
Size among operating wind plants.
- In Americas
- 62nd
- Age
- 14 yrs
of 1,910
Country average for wind: 13 yrs
3.2× the average wind plant in the United States. About 40% of the size of the largest.
FAQ
About Blue Summit wind farm.
Who owns Blue Summit wind farm?
Its main owner is NextEra Energy Inc.
How big is Blue Summit wind farm?
It has 434 MW of operating capacity across 3 units. That makes it the 50th largest wind plant in the United States and the 266th largest in the world.
Where is Blue Summit wind farm?
In Wilbarger County, Texas, United States, at 34.2054, -99.4781.
When was Blue Summit wind farm built?
Its first unit started in 2012 and its newest in 2019.
How much electricity does Blue Summit wind farm generate?
It reported 369 GWh in 2019, a capacity factor of 10%, according to the WRI Global Power Plant Database.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Wind Power Tracker (2026-02) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0061970
- GEM plant IDL100000906972
- EIA plant ID58372
- EIA plant ID61970
- EIA plant ID62566
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.