All plants / United States / South Dakota
Big Bend Dam hydroelectric plant
Chamberlain · Buffalo County · South Dakota · United States
- Operating capacity
- 538 MW
- Units
- 1
- Online since
- 1964
- Age
- 62 yrs
Big Bend Dam hydroelectric plant is a 538 MW hydropower plant in Chamberlain, South Dakota, United States.
It has been operating since 1964. It is a conventional storage plant on the Missouri River. It is owned mainly by US Army Corps of Engineers - Omaha District. By capacity it is the 41st largest of 1,436 operating hydropower plants in the United States.
- Owner
- US Army Corps of Engineers - Omaha District
US Army Corps of Engineers - Omaha District [100%]
- Operator
- US Army Corps of Engineers - Omaha District
- Coordinates
- 44.0384, -99.4463 (exact)
- GEM plant ID
- L100000603726
Plant details
How this hydropower plant is built and run.
- Type
- Conventional storage
- River
- Missouri River
- Turbines
- 8 x 67.3 MW
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 1.5 TWh
- Capacity factor
- 32%
- Reported by
- U.S. Energy Information Administration
Reported · 2019
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | 742.76 | 1,501.56 | 16% | HYDRO-V1 |
| 2014 | 1,032.49 | 1,372.40 | 22% | HYDRO-V1 |
| 2015 | 843.57 | 1,095.48 | 18% | HYDRO-V1 |
| 2016 | 726.34 | 1,499.95 | 15% | HYDRO-V1 |
| 2017 | 954.40 | 1,084.53 | 20% | HYDRO-V1 |
| 2018 | 1,193.25 | — | 25% | — |
| 2019 | 1,525.06 | — | 32% | — |
How it compares
Size among operating hydropower plants.
- Age
- 62 yrs
Country average for hydropower: 71 yrs
7.5× the average hydropower plant in the United States. About 13% of the size of the largest.
FAQ
About Big Bend Dam hydroelectric plant.
Who owns Big Bend Dam hydroelectric plant?
Its main owner is US Army Corps of Engineers - Omaha District.
How big is Big Bend Dam hydroelectric plant?
It has 538 MW of operating capacity. That makes it the 41st largest hydropower plant in the United States and the 556th largest in the world.
Where is Big Bend Dam hydroelectric plant?
In Chamberlain, Buffalo County, South Dakota, United States, at 44.0384, -99.4463.
When was Big Bend Dam hydroelectric plant built?
It started operating in 1964.
Which river is Big Bend Dam hydroelectric plant on?
The Missouri River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · USA0003375
- GEM plant IDL100000603726
- WEPP ID35533
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.