Bezirk Liezen solar project II

SolarOperatingAssumed PV

Bezirk Liezen · Styria · Austria

Operating capacity
5.3 MW
Units
1
Online since
2023
Age
3 yrs

Bezirk Liezen solar project II is a 5.3 MW solar power plant in Bezirk Liezen, Styria, Austria.

It has been operating since 2023. By capacity it is the 34th largest of 214 operating solar plants in Austria.

Owner
—
Coordinates
47.7125, 14.6856 (exact)
GEM plant ID
L100001007236

Plant details

How this solar plant is built and run.

Technology
Assumed PV
Capacity rating
MWac (grid-connection AC capacity)

How it compares

Size among operating solar plants.

In Austria
34th

of 214 solar plants · see all

In Europe
6,385th

of 28,467

In the world
23,282nd

of 79,372 · largest solar plants

Age
3 yrs

Country average for solar: 5 yrs

This plantBezirk Liezen solar project II
5.3 MW
Average solar plantIn Austria, across 214 plants
4.0 MW
Largest in AustriaWallern-Tadten solar farm
164 MW

1.3× the average solar plant in Austria. About 3% of the size of the largest.

FAQ

About Bezirk Liezen solar project II.

How big is Bezirk Liezen solar project II?

It has 5.3 MW of operating capacity. That makes it the 34th largest solar plant in Austria and the 23,282nd largest in the world.

Where is Bezirk Liezen solar project II?

In Bezirk Liezen, Styria, Austria, at 47.7125, 14.6856.

When was Bezirk Liezen solar project II built?

It started operating in 2023.

What kind of power plant is Bezirk Liezen solar project II?

It is a solar power plant using Assumed PV technology.

Is Bezirk Liezen solar project II still operating?

Yes. 5.3 MW is in operation.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100001007236
  • TZ unit ID260844
  • TZ unit ID893908
  • TZ unit ID1235709

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.