All plants / China / Beijing
Beijing Chaoyang District power station
北京市朝阳生活垃圾综合处理厂焚烧中心
Jinzhan · Chaoyang District · Beijing · China
- Operating capacity
- 66 MW
- Units
- 6
- Online since
- 2009
- Age
- 17 yrs
Beijing Chaoyang District power station is a 66 MW waste-to-energy plant in Jinzhan, Beijing, China.
It has 6 units, which came online between 2009 and 2016. It is owned mainly by Beijing Chaoyang Environment Group Co Ltd and operated by Beijing Gaoantun Waste Incineration. Traced to the top of the ownership chain, its largest owner is Beijing Chaoyang Environment Group (100%). By capacity it is the 60th largest of 764 operating waste-to-energy plants in China.
- Owner
- Beijing Chaoyang Environment Group Co Ltd
Beijing Chaoyang Environment Group Co Ltd [100%]
- Parent company
- Beijing Chaoyang Environment Group Co Ltd [100.0%]
- Operator
- Beijing Gaoantun Waste Incineration
- In development
- 80 MW
- Coordinates
- 39.9469, 116.6147 (exact)
- GEM plant ID
- L100000201789
Plant details
How this waste-to-energy plant is built and run.
- Fuel
- Refuse (municipal and industrial wastes), refuse (municipal and industrial wastes), wastewater and sewage sludge (solids or biogas)
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Beijing Chaoyang Environment Group Company100%
Ultimately owned by
- Beijing Chaoyang Environment Group Company100%
No share traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
6 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology |
|---|---|---|---|---|---|
| 46023.0 | 15 MW | Operating | 2009 | — | — |
| 46024.0 | 15 MW | Operating | 2009 | — | — |
| 46054.0 | 18 MW | Operating | 2016 | — | — |
| 46055.0 | 18 MW | Operating | 2016 | — | — |
| 46082.0 | 40 MW | Announced | — | — | — |
| 46083.0 | 40 MW | Announced | — | — | — |
How it compares
Size among operating waste-to-energy plants.
- In Asia
- 67th
- Age
- 17 yrs
of 874
Country average for waste-to-energy: 7 yrs
2.3× the average waste-to-energy plant in China. About 24% of the size of the largest.
FAQ
About Beijing Chaoyang District power station.
Who owns Beijing Chaoyang District power station?
Its main owner is Beijing Chaoyang Environment Group Co Ltd. Traced to the top of each ownership chain, its owners are Beijing Chaoyang Environment Group (100%). It is operated by Beijing Gaoantun Waste Incineration.
How big is Beijing Chaoyang District power station?
It has 66 MW of operating capacity across 6 units. That makes it the 60th largest waste-to-energy plant in China and the 108th largest in the world.
Where is Beijing Chaoyang District power station?
In Jinzhan, Chaoyang District, Beijing, China, at 39.9469, 116.6147.
When was Beijing Chaoyang District power station built?
Its first unit started in 2009 and its newest in 2016.
What kind of power plant is Beijing Chaoyang District power station?
It is a waste-to-energy plant, fuelled by refuse (municipal and industrial wastes). It can also run on bioenergy.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Bioenergy Power Tracker (2026-10) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000201789
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.