All plants / Spain / Castile-La Mancha
Azután hydroelectric plant
Campana de Oropesa · Toledo · Castile-La Mancha · Spain
- Operating capacity
- 180 MW
- Units
- 1
- Online since
- 1970
- Age
- 56 yrs
Azután hydroelectric plant is a 180 MW hydropower plant in Campana de Oropesa, Castile-La Mancha, Spain.
It has been operating since 1970. It is a conventional storage plant on the Tajo River. It is owned mainly by Iberdrola SA and operated by Iberdrola. By capacity it is the 30th largest of 168 operating hydropower plants in Spain.
- Owner
- Iberdrola SA
Iberdrola SA [100%]
- Operator
- Iberdrola
- Coordinates
- 39.7798, -5.0876 (exact)
- GEM plant ID
- L100000603345
Plant details
How this hydropower plant is built and run.
- Type
- Conventional storage
- River
- Tajo River
- Turbines
- 3 turbines
Electricity output
How much power this plant produces.
WRI Global Power Plant Database, 2013–2019.
- Latest annual output
- 213 GWh
- Capacity factor
- 13%
- Estimation method
- Hydro model
Estimated · 2017
Output as a share of running at full power all year
Show data table
| Year | Reported (GWh) | Estimated (GWh) | Capacity factor | Method |
|---|---|---|---|---|
| 2013 | — | 626.74 | 40% | HYDRO-V1 |
| 2014 | — | 633.25 | 40% | HYDRO-V1 |
| 2015 | — | 222.49 | 14% | HYDRO-V1 |
| 2016 | — | 545.28 | 35% | HYDRO-V1 |
| 2017 | — | 212.59 | 13% | HYDRO-V1 |
| 2018 | — | — | — | — |
| 2019 | — | — | — | — |
How it compares
Size among operating hydropower plants.
- In Europe
- 310th
- Age
- 56 yrs
of 1,398
Country average for hydropower: 62 yrs
1.6× the average hydropower plant in Spain. About 19% of the size of the largest.
FAQ
About Azután hydroelectric plant.
Who owns Azután hydroelectric plant?
Its main owner is Iberdrola SA. It is operated by Iberdrola.
How big is Azután hydroelectric plant?
It has 180 MW of operating capacity. That makes it the 30th largest hydropower plant in Spain and the 1,428th largest in the world.
Where is Azután hydroelectric plant?
In Campana de Oropesa, Toledo, Castile-La Mancha, Spain, at 39.7798, -5.0876.
When was Azután hydroelectric plant built?
It started operating in 1970.
Which river is Azután hydroelectric plant on?
The Tajo River.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Hydropower Tracker (2026-03) · GEM Wiki page
- Output 2013–2019WRI Global Power Plant Database v1.3.0 · WRI1006222
- GEM plant IDL100000603345
- WEPP ID1019083
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.