All plants / China / Shandong
Asia Symbol captive power station
山东亚太森博浆纸有限公司热电项目
Rizhao · Shandong · China
- Operating capacity
- 179 MW
- Units
- 5
- Online since
- 2010
- CO₂ a year
- 0.4 Mt
Asia Symbol captive power station is a 179 MW bioenergy power plant in Rizhao, Shandong, China.
It has 5 units, which came online between 2001 and 2023. It is owned mainly by Asia Symbol (Shangdong) Pulp and Paper Co Ltd and operated by Asia Symbol (Shandong) Pulp & Paper. Traced to the top of the ownership chain, its largest owner is Singapore Asia Pacific Symbo Rizhao Co Ltd (ASIA SYMBOL RIZHAO PTE.LTD) (90%). Global Energy Monitor estimates it emits about 0.4 million tonnes of CO₂ a year. By capacity it is the 8th largest of 362 operating bioenergy plants in China.
- Owner
- Asia Symbol (Shangdong) Pulp and Paper Co Ltd
Asia Symbol (Shangdong) Pulp and Paper Co Ltd [100%]
- Parent company
- Singapore Asia Pacific Symbo Rizhao Co Ltd (ASIA SYMBOL RIZHAO PTE.LTD) [90.0%]; AP Trading Enterprise [9.3%]; unknown [0.7%]
- Operator
- Asia Symbol (Shandong) Pulp & Paper
- Retired
- 220 MW (last in 2023)
- Coordinates
- 35.3748, 119.5086 (exact)
- GEM plant ID
- L100000104890
Plant details
How this bioenergy plant is built and run.
- Combined heat and power
- Yes
- Captive plant
- Supplies pulp & paper industry (power and heat)
Climate
Carbon dioxide from this plant, as estimated by Global Energy Monitor.
- CO₂ a year
- 0.42 Mt
- CO₂ over remaining life
- 8 Mt
- Capacity factor
- 52%
- Efficiency
- 31%
Million tonnes, operating units
Up to 19 more years of operation
Country average GEM assumes for its coal fleet, not this plant's own figure
From a heat rate of 11,187 Btu/kWh
Retirement and national pledges
- Planned retirement
- Not announced
- Coal phase-out pledge
- None recorded
- Net-zero target
- 2060in 34 years
No retirement date has been announced, so nothing yet ties the plant to China’s 2060 net-zero target. Pledges are national commitments recorded by Global Energy Monitor.
Timeline
When each unit started, retired, or is planned to retire.
- Operating
- Retired
- In development
- Until planned retirement
Who owns it
Direct owners, and the owners at the top of each chain, as a share of operating capacity.
Direct owners
- Asia Symbol (Shangdong) Pulp and Paper Company100%
Ownership chain
- Singapore Asia Pacific Symbo Rizhao Co Ltd (ASIA SYMBOL RIZHAO PTE.LTD) Companyowns 90% of Asia Symbol (Shangdong) Pulp and Paper
- Asia Symbol (Shangdong) Pulp and Paper Companyowns 100% of this plant
Ultimately owned by
- Singapore Asia Pacific Symbo Rizhao Co Ltd (ASIA SYMBOL RIZHAO PTE.LTD) Company90%
- AP Trading Enterprise Company9.3%
- Share not traceable0.7%
No share traced to a government or state body.
See every plant owned by
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.
Units
5 units at this site.
| Unit | Capacity | Status | Start | Retired / planned | Technology | Coal | CO₂ a year |
|---|---|---|---|---|---|---|---|
| Unit 1 | 35 MW | Retired | 2001 | 2023 | — | — | — |
| Unit 2 | 92 MW | Retired | 2010 | 2023 | — | — | — |
| Unit 3 | 82 MW | Operating | 2010 | — | — | — | 0.42 Mt |
| Unit 4 | 92 MW | Retired | 2010 | 2023 | — | — | — |
| 1.0 | 97 MW | Operating | 2023 | — | — | Bioenergy: paper mill wastes | — |
How it compares
Size among operating bioenergy plants.
- In Asia
- 14th
- Age
- 16 yrs
of 845
Country average for bioenergy: 8 yrs
4.3× the average bioenergy plant in China. About 33% of the size of the largest.
FAQ
About Asia Symbol captive power station.
Who owns Asia Symbol captive power station?
Its main owner is Asia Symbol (Shangdong) Pulp and Paper Co Ltd. Traced to the top of each ownership chain, its owners are Singapore Asia Pacific Symbo Rizhao Co Ltd (ASIA SYMBOL RIZHAO PTE.LTD) (90%) and AP Trading Enterprise (9%). It is operated by Asia Symbol (Shandong) Pulp & Paper.
How big is Asia Symbol captive power station?
It has 179 MW of operating capacity across 5 units. That makes it the 8th largest bioenergy plant in China and the 50th largest in the world.
Where is Asia Symbol captive power station?
In Rizhao, Shandong, China, at 35.3748, 119.5086.
When was Asia Symbol captive power station built?
Its first unit started in 2001 and its newest in 2023.
How much CO₂ does Asia Symbol captive power station emit?
Global Energy Monitor estimates about 0.4 million tonnes of CO₂ a year, and 8 million tonnes over the rest of its expected life.
Sources and identifiers
- Plant dataGlobal Energy Monitor, Global Coal Plant Tracker (2026-07) · GEM Wiki page
- OwnershipGlobal Energy Monitor, Global Energy Ownership Tracker, September 2026
- GEM plant IDL100000104890
Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.