Global Power Plant Directory121,919 plants · 219 countries & territories

All plants / United States / South Carolina

Allora Solar

SolarOperatingPV

Gilbert · Lexington County · South Carolina · United States

Operating capacity
75 MW
Units
1
Online since
2023
Age
3 yrs

Allora Solar is a 75 MW solar power plant in Gilbert, South Carolina, United States.

It has been operating since 2023. It is owned mainly by Silver Pine Energy Holdings. By capacity it is the 538th largest of 6,708 operating solar plants in the United States.

Owner
Silver Pine Energy Holdings

Silver Pine Energy Holdings [100%]

Operator
Silver Pine Energy Holdings
Coordinates
33.8993, -81.4005 (exact)
GEM plant ID
L100000805340

Plant details

How this solar plant is built and run.

Technology
PV
Capacity rating
MWac (grid-connection AC capacity)

How it compares

Size among operating solar plants.

In the United States
538th

of 6,708 solar plants · see all

In Americas
754th

of 11,032

In the world
3,879th

of 79,372 · largest solar plants

Age
3 yrs

Country average for solar: 7 yrs

This plantAllora Solar
75 MW
Average solar plantIn the United States, across 6,708 plants
23 MW
Largest in the United StatesEdwards Sanborn solar farm
957 MW

3.2× the average solar plant in the United States. About 8% of the size of the largest.

FAQ

About Allora Solar.

Who owns Allora Solar?

Its main owner is Silver Pine Energy Holdings.

How big is Allora Solar?

It has 75 MW of operating capacity. That makes it the 538th largest solar plant in the United States and the 3,879th largest in the world.

Where is Allora Solar?

In Gilbert, Lexington County, South Carolina, United States, at 33.8993, -81.4005.

When was Allora Solar built?

It started operating in 2023.

What kind of power plant is Allora Solar?

It is a solar power plant using PV technology.

Sources and identifiers

  • Plant dataGlobal Energy Monitor, Global Solar Power Tracker (2026-02) · GEM Wiki page
  • GEM plant IDL100000805340
  • EIA plant ID63808

Licensed CC BY 4.0. Spotted an error? Plant data corrections go to Global Energy Monitor.