Tianjin TEDA

Tianjin TEDA Co Ltd

天津泰达股份有限公司

Website ↗
Owned operating capacity
64 MW
Operating plants
3
In development
0.0 MW
Countries
1
Global rank
#8,495

Tianjin TEDA is recorded by Global Energy Monitor as a company headquartered in China, listed on a stock exchange. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 64 MW at 3 plants in 1 country, ranking #8,495 of 13,356 owners on this site. 71% of that is waste-to-energy, followed by bioenergy (29%). Its largest holding is Jiangsu Yangzhou (Taida) power station in China, where its share of 62.5% equals 31 MW. The biggest part is held through Tianjin TEDA Environmental Protection (about 64 MW). The capacity-weighted average age of its operating capacity is 9 years.

Fleet at a glance

Owned capacity by status, fuel and country.

By status

  • Operating64 MW100%

Operating, by fuel

  • Waste45 MW71%
  • Biomass19 MW29%

Operating, by country

Operating capacity by decade it started · average age 9 years

2010s: 45 MW2010s45 MW2020s: 19 MW2020s19 MW

Map

3 operating plants with a stake held by Tianjin TEDA.

Compared with peers

Largest company owners in China, by owned operating capacity.

Ownership structure

Who owns Tianjin TEDA, and what it owns.

Owned by

GEM records no owner above Tianjin TEDA in this release, so it is treated as the top of its ownership chain.

Owns 1 company

Power plants

3 plants with a stake, largest owned capacity first.

PlantCountryFuelStatusOwned shareOwned operatingPlant operating
Jiangsu Yangzhou (Taida) power stationJiangsu · indirect China Waste Operating 62.5% 31 MW 50 MW
Hebei Gucheng power stationHebei · indirect China Biomass Operating 62.5% 19 MW 30 MW
Anhui Huangshan (TEDA) power stationAnhui · indirect China Waste Operating 62.5% 14 MW 22 MW

Facts

Name
Tianjin TEDA
Full name
Tianjin TEDA Co Ltd
Local name
天津泰达股份有限公司
Other names
天津美纶股份有限公司 [former]
Type
Company
Legal form
Co Ltd
Publicly listed
Yes
Headquarters
China
Registered in
China
GEM entity ID
E100000129954

Questions

How much power plant capacity does Tianjin TEDA own?

Weighted by its ownership share, Tianjin TEDA owns 64 MW of operating coal, oil and gas and bioenergy capacity at 3 plants in 1 countries. A further 0.0 MW is in development and 0.0 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.

What is Tianjin TEDA’s largest power plant?

Jiangsu Yangzhou (Taida) power station in China is its largest holding by owned operating capacity (31 MW, a 62.5% share).

Who owns Tianjin TEDA?

Global Energy Monitor records no owner above Tianjin TEDA in this release.

Which fuels do Tianjin TEDA’s power plants use?

waste-to-energy 71%, bioenergy 29% of its owned operating capacity.

How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.