Companies / Governments and state bodies / China
State-owned Assets Supervision and Administration Commission
国务院国有资产监督管理委员会
- Owned operating capacity
- 23.1 GW
- Operating plants
- 142
- In development
- 9.1 GW
- Countries
- 15
- Global rank
- #63
State-owned Assets Supervision and Administration Commission is recorded by Global Energy Monitor as a state body in China. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 23.1 GW at 142 plants in 15 countries, ranking #63 of 13,356 owners on this site. 59% of that is gas, followed by coal (38%). Its largest holding is Alor Gajah (Melaka) power station in Malaysia, where its share of 100% equals 2.2 GW. The biggest part is held through China National Petroleum (about 6.0 GW). A further 9.1 GW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 14 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating23.1 GW44%
- Under construction1.8 GW3%
- Pre-construction4.1 GW8%
- Announced3.2 GW6%
- Shelved5.5 GW10%
- Retired1.5 GW3%
- Cancelled13.5 GW26%
Operating, by fuel
Operating, by country (top 10)
Operating capacity by decade it started · average age 14 years
Map
142 operating plants with a stake held by State-owned Assets Supervision and Administration Commission.
Compared with peers
Largest state body owners worldwide, by owned operating capacity.
Ownership structure
Who owns State-owned Assets Supervision and Administration Commission, and what it owns.
Owned by
- Government of China Government100%
Owns 7 companies
- China National Petroleum 6.0 GW operating100%
- China National Offshore Oil 5.8 GW operating90%
- Power Construction Corporation of China 5.1 GW operating100%
- China General Nuclear Power Group 4.8 GW operating100%
- State Grid Corporation of China 2.1 GW operating92.9%
- China Resources National 8.7 MW operating100%
- China Post Group100%
Power plants
162 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| Alor Gajah (Melaka) power stationMelaka · indirect | Malaysia | Gas | Operating | 100% | 2.2 GW | 2.2 GW |
| Gansu Chongxin power stationGansu · indirect | China | Coal | Operating | 92% | 1.2 GW | 1.3 GW |
| CNOOC Zhongshan Jiaming Gas power stationGuangdong · indirect | China | Gas | Operating | 47.4% | 1.1 GW | 2.4 GW |
| CNOOC Putian Gas power stationFujian · indirect | China | Gas | Operating | 49.5% | 772 MW | 1.6 GW |
| Yudean Huizhou Gas power stationGuangdong · indirect | China | Gas | Operating | 29.7% | 757 MW | 2.6 GW |
| Daqing Oil Central power stationHeilongjiang · indirect | China | Coal | Operating | 80.4% | 724 MW | 900 MW |
| Telok Gong 2 power stationMelaka · indirect | Malaysia | Gas | Operating | 100% | 720 MW | 720 MW |
| CNOOC Shenzhen power plantGuangdong · indirect | China | Gas | Operating | 90% | 689 MW | 765 MW |
| Port Qasim EPC power stationSindh · indirect | Pakistan | Coal | Operating | 51% | 673 MW | 1.3 GW |
| Pan'nan low-heat-value coal power stationGuizhou · indirect | China | Coal | Operating | 100% | 660 MW | 660 MW |
| Jurong power stationJiangsu · indirect | China | Coal | Operating | 16.1% | 643 MW | 4.0 GW |
| CNOOC Zhuhai Gas power stationGuangdong · indirect | China | Gas | Operating | 67.5% | 621 MW | 920 MW |
| CKI Lamma power stationindirect | Hong Kong | Gas | Operating | 19.5% | 594 MW | 3.0 GW |
| Kuala Langat power stationSelangor · indirect | Malaysia | Gas | Operating | 75% | 540 MW | 720 MW |
| Powertek power stationMelaka · indirect | Malaysia | Gas | Operating | 100% | 440 MW | 440 MW |
| Wangting power stationJiangsu · indirect | China | Gas | Operating | 12.4% | 414 MW | 3.3 GW |
| Dushanzi Ethene power stationXinjiang · indirect | China | Coal | Operating | 80.4% | 382 MW | 475 MW |
| CNOOC Hainan Yangpu Gas power stationHainan · indirect | China | Gas | Operating | 85.5% | 376 MW | 440 MW |
| Datang Wanning Gas power stationHainan · indirect | China | Gas | Operating | 37.8% | 348 MW | 920 MW |
| Barisal power stationBarisal · indirect | Bangladesh | Coal | Operating | 96% | 336 MW | 350 MW |
| Huaneng Dongguan Gas Thermal power stationGuangdong · indirect | China | Gas | Operating | 16.1% | 312 MW | 1.9 GW |
| CNPC Fushun Petrochemical power stationLiaoning · indirect | China | Coal | Operating | 100% | 310 MW | 310 MW |
| SPIC Zhoukou Gas power stationHenan · indirect | China | Gas | Operating | 33.8% | 304 MW | 900 MW |
| Huaneng Chongqing Liangjiang Gas power stationChongqing · indirect | China | Gas | Operating | 12.1% | 292 MW | 2.4 GW |
| Jinjie power stationShaanxi · indirect | China | Coal | Operating | 7.4% | 277 MW | 3.7 GW |
| Banshkhali power station (S Alam)Chittagong · indirect | Bangladesh | Coal | Operating | 20% | 264 MW | 1.3 GW |
| SPIC Zhengzhou Gas power stationHenan · indirect | China | Gas | Operating | 33.8% | 264 MW | 780 MW |
| Daqing Ethylene Plant power stationHeilongjiang · indirect | China | Coal | Operating | 80.4% | 257 MW | 320 MW |
| Xinjiang Kelamayi power stationXinjiang · indirect | China | Gas | Operating | 80.4% | 256 MW | 319 MW |
| Xingtai power stationHebei · indirect | China | Coal | Operating | 41.5% | 249 MW | 600 MW |
| Meghnaghat (MPL) power stationDhaka · indirect | Bangladesh | Gas | Operating | 55% | 248 MW | 450 MW |
| Jiangsu Zhenjiang Gas Thermal power stationJiangsu · indirect | China | Gas | Operating | 24.1% | 229 MW | 950 MW |
| Taweelah B Power and Desalination StationAbu Dhabi · indirect | United Arab Emirates | Gas | Operating | 10% | 225 MW | 2.3 GW |
| Gansu Huating power stationGansu · indirect | China | Coal | Operating | 75% | 218 MW | 290 MW |
| Huadian Zengcheng Gas Thermal power stationGuangdong · indirect | China | Gas | Operating | 16.1% | 215 MW | 1.3 GW |
| Braemar 2 power stationQueensland · indirect | Australia | Gas | Operating | 40.2% | 209 MW | 519 MW |
| Haripur (HPL) power stationDhaka · indirect | Bangladesh | Gas | Operating | 55% | 198 MW | 360 MW |
| CNOOC Jiangsu Funing power stationJiangsu · indirect | China | Gas | Operating | 90% | 180 MW | 200 MW |
| Jerada power stationOriental · indirect | Morocco | Coal | Operating | 50% | 175 MW | 350 MW |
| Liaoyang Chemical power stationLiaoning · indirect | China | Coal | Operating | 80.4% | 161 MW | 200 MW |
| Daqing Oil Hongwei power stationHeilongjiang · indirect | China | Coal | Operating | 80.4% | 161 MW | 200 MW |
| Binzhou Boxing power stationShandong · indirect | China | Coal | Operating | 8% | 160 MW | 2.0 GW |
| Zhanazhol 3 power stationAktobe · indirect | Kazakhstan | Gas | Operating | 100% | 160 MW | 160 MW |
| Mawan power stationGuangdong · indirect | China | Coal | Operating | 8% | 157 MW | 2.0 GW |
| Arctic LNG 2 Terminal power stationYamal-Nenets · indirect | Russia | Gas | Operating | 15.4% | 154 MW | 1.0 GW |
| Huadian Qishuyan Gas power stationJiangsu · indirect | China | Gas | Operating | 6.7% | 145 MW | 2.2 GW |
| Yangcheng power stationShanxi · indirect | China | Coal | Operating | 4.3% | 141 MW | 3.3 GW |
| Bengkulu power stationSumatera · indirect | Indonesia | Coal | Operating | 70% | 140 MW | 200 MW |
| Kaiyuan power stationYunnan · indirect | China | Coal | Operating | 9.5% | 124 MW | 1.3 GW |
| Weixin power stationYunnan · indirect | China | Coal | Operating | 9% | 108 MW | 1.2 GW |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| Pan'nan low-heat-value coal power stationUnit 2 | China | Coal | Under construction | 2026 | 660 MW | 660 MW |
| CNOOC Shenzhen power plantNew 2 | China | Gas | Under construction | 2026 | 477 MW | 530 MW |
| Wangting power stationUnit 7 | China | Coal | Under construction | 2024 | 106 MW | 660 MW |
| Wangting power stationUnit 8 | China | Coal | Under construction | 2024 | 106 MW | 660 MW |
| Arctic LNG 2 Terminal power stationPhase 2 (Beregovaya GTES) | Russia | Gas | Under construction | 2028 | 77 MW | 500 MW |
| CKI Lamma power stationL13 | Hong Kong | Gas | Under construction | 2029 | 74 MW | 380 MW |
| Shandong Fengyuan Gas Thermal power station2 | China | Gas | Under construction | — | 64 MW | 200 MW |
| Mawan power stationReplace Unit 1 | China | Coal | Under construction | 2027 | 53 MW | 660 MW |
| Mawan power stationReplace Unit 2 | China | Coal | Under construction | 2027 | 53 MW | 660 MW |
| Xiaolongtan power stationPhase IV Unit 9 | China | Coal | Under construction | — | 35 MW | 700 MW |
| CKI Lamma power stationGT2R(GT8) | Hong Kong | Oil | Under construction | 2027 | 25 MW | 130 MW |
| CKI Lamma power stationGT4R(GT10) | Hong Kong | Oil | Under construction | 2028 | 25 MW | 130 MW |
| CKI Lamma power stationGT3R(GT9) | Hong Kong | Oil | Under construction | 2027 | 25 MW | 130 MW |
| Volta Cogeneration Power Station1 | United Arab Emirates | Gas | Under construction | 2028 | 12 MW | 300 MW |
| Jilin Changchun Jiutai District power station1.0 | China | Biomass | Under construction | — | 0.3 MW | 30 MW |
| Musina-Makhado power stationReduced capacity | South Africa | Coal | Pre-construction | — | 1.3 GW | 1.3 GW |
| Guangxi CNOOC Beihai power station2 | China | Gas | Pre-construction | — | 477 MW | 530 MW |
| Guangxi CNOOC Beihai power station1 | China | Gas | Pre-construction | — | 477 MW | 530 MW |
| Shanghai Expansion power station1 | China | Gas | Pre-construction | 2030 | 288 MW | 1.6 GW |
| Three Gorges Energy Group Yingkou Gas Thermal power station2 | China | Gas | Pre-construction | 2027 | 141 MW | 500 MW |
| Three Gorges Energy Group Yingkou Gas Thermal power station1 | China | Gas | Pre-construction | 2027 | 141 MW | 500 MW |
| Termonordeste power station2 | Brazil | Gas | Pre-construction | 2028 | 121 MW | 291 MW |
| Tongliang District Distributed Energy Station1 | China | Gas | Pre-construction | — | 121 MW | 150 MW |
| Tongliang District Distributed Energy Station2 | China | Gas | Pre-construction | — | 121 MW | 150 MW |
| CNOOC Hainan Yangpu Gas power station3 | China | Gas | Pre-construction | — | 103 MW | 120 MW |
| CNOOC Hainan Yangpu Gas power station4 | China | Gas | Pre-construction | — | 103 MW | 120 MW |
| CNOOC Hainan Yangpu Gas power station5 | China | Gas | Pre-construction | — | 103 MW | 120 MW |
| Guodian Penglai power stationPhase II Unit 4 | China | Coal | Pre-construction | — | 100 MW | 1.0 GW |
| Guodian Penglai power stationPhase II Unit 3 | China | Coal | Pre-construction | — | 100 MW | 1.0 GW |
| Yangcheng power stationPhase III Unit 9 | China | Coal | Pre-construction | — | 67 MW | 1.0 GW |
Facts
- Name
- State-owned Assets Supervision and Administration Commission
- Local name
- 国务院国有资产监督管理委员会
- Abbreviation
- SASAC
- Other names
- State-owned Assets Supervision and Administration Commission of the State Council; 国务院
- Type
- State body
- Registered in
- China
- Legal Entity Identifier
- not found
- PermID
- not found
- GEM entity ID
- E100001000086
Questions
How much power plant capacity does State-owned Assets Supervision and Administration Commission own?
Weighted by its ownership share, State-owned Assets Supervision and Administration Commission owns 23.1 GW of operating coal, oil and gas and bioenergy capacity at 142 plants in 15 countries. A further 9.1 GW is in development and 1.5 GW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is State-owned Assets Supervision and Administration Commission’s largest power plant?
Alor Gajah (Melaka) power station in Malaysia is its largest holding by owned operating capacity (2.2 GW, a 100% share).
Who owns State-owned Assets Supervision and Administration Commission?
Global Energy Monitor records 1 direct owner: Government of China (100%).
Is State-owned Assets Supervision and Administration Commission building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 9.1 GW, including 1.8 GW under construction.
Which fuels do State-owned Assets Supervision and Administration Commission’s power plants use?
gas 59%, coal 38%, bioenergy 2%, oil 1%, waste-to-energy 0% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.