Global Power Plant Directory121,919 plants · 219 countries & territories

Companies / Company / Singapore

CompanyJoint venture

Sobono Bioenergy

Sobono Bioenergy Pte Ltd

Website ↗
Owned operating capacity
0.0 MW
Operating plants
0
In development
6.5 MW
Countries
0
Global rank
—

Sobono Bioenergy is recorded by Global Energy Monitor as a company headquartered in Singapore. It has no share in operating coal, oil and gas or bioenergy plants in GEM’s data, but it is involved in 6.5 MW of planned or under-construction capacity.

Fleet at a glance

Owned capacity by status, fuel and country.

By status

  • Under construction6.5 MW100%

Ownership structure

Who owns Sobono Bioenergy, and what it owns.

Owned by

GEM’s designated parent: Sobono (70%)

Owns

No company stakes recorded; it owns its plants directly.

Power plants

1 plant with a stake, largest owned capacity first.

PlantCountryFuelStatusOwned shareOwned operatingPlant operating
RExus power stationNorth West Singapore Biomass Under construction 50% — 13 MW planned

Pipeline

Units under construction, in pre-construction or announced.

UnitCountryFuelStatusPlanned startOwnedUnit size
RExus power station-- Singapore BiomassUnder construction 2026 6.5 MW13 MW

Facts

Name
Sobono Bioenergy
Full name
Sobono Bioenergy Pte Ltd
Type
Company
Legal form
Pte Ltd
Publicly listed
No
Joint venture
Yes
Headquarters
Central Singapore, Singapore
Registered in
Singapore
Legal Entity Identifier
not found
PermID
5090706962
GEM entity ID
E100002016216

Questions

How much power plant capacity does Sobono Bioenergy own?

Sobono Bioenergy has no share in operating coal, oil and gas or bioenergy plants in Global Energy Monitor’s ownership data.

What is Sobono Bioenergy’s largest power plant?

RExus power station in Singapore is its largest holding by owned operating capacity (0.0 MW, a 0% share).

Who owns Sobono Bioenergy?

Global Energy Monitor records 2 direct owners: Sobono (70%); PacificLight Power (30%).

Is Sobono Bioenergy building new power plants?

Yes. Its share of units under construction, in pre-construction or announced is 6.5 MW, including 6.5 MW under construction.

How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.

Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.