SIIC Yangtze River Delta Ecological Development
SIIC Yangtze River Delta Ecological Development Co Ltd
上实长三角生态发展有限公司
- Owned operating capacity
- 96 MW
- Operating plants
- 18
- In development
- 13 MW
- Countries
- 1
- Global rank
- #7,653
SIIC Yangtze River Delta Ecological Development is recorded by Global Energy Monitor as a company headquartered in China. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 96 MW at 18 plants in 1 country, ranking #7,653 of 13,356 owners on this site. 82% of that is waste-to-energy, followed by bioenergy (18%). Its largest holding is Zhejiang Ningbo Haishu District (Kangheng) power station in China, where its share of 28.3% equals 14 MW. The biggest part is held through Shanghai Shangshi Yangtze River Delta Ecological Development (about 96 MW). A further 13 MW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 6 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating96 MW88%
- Under construction6.2 MW6%
- Pre-construction6.8 MW6%
Operating, by fuel
Operating, by country
Operating capacity by decade it started · average age 6 years
Map
18 operating plants with a stake held by SIIC Yangtze River Delta Ecological Development.
Compared with peers
Largest company owners in China, by owned operating capacity.
Ownership structure
Who owns SIIC Yangtze River Delta Ecological Development, and what it owns.
Owned by
GEM records no owner above SIIC Yangtze River Delta Ecological Development in this release, so it is treated as the top of its ownership chain.
Owns 1 company
- Shanghai Shangshi Yangtze River Delta Ecological Development 96 MW operating100%
Power plants
22 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| Zhejiang Ningbo Haishu District (Kangheng) power stationZhejiang · indirect | China | Waste | Operating | 28.3% | 14 MW | 50 MW |
| Liaoning Xifeng power stationLiaoning · indirect | China | Biomass | Operating | 28.3% | 8.5 MW | 30 MW |
| Henan Guangshan (Kangheng) power stationHenan · indirect | China | Waste | Operating | 28.3% | 8.5 MW | 30 MW |
| Henan Guangshan power stationHenan · indirect | China | Biomass | Operating | 28.3% | 8.5 MW | 30 MW |
| Hebei Shunping (Kangheng) power stationHebei · indirect | China | Waste | Operating | 26.9% | 6.5 MW | 24 MW |
| Hebei Xianghe (Kangheng) power stationHebei · indirect | China | Waste | Operating | 28.3% | 5.1 MW | 18 MW |
| Hunan Loudi (Kangheng) power stationHunan · indirect | China | Waste | Operating | 28.3% | 5.1 MW | 18 MW |
| Guangdong Xingning (Kangheng) power stationGuangdong · indirect | China | Waste | Operating | 28.3% | 5.1 MW | 18 MW |
| Hubei Guangshui (Kangheng) power stationHubei · indirect | China | Waste | Operating | 28.3% | 4.2 MW | 15 MW |
| Fujian Minhou power stationFujian · indirect | China | Waste | Operating | 28.3% | 4.2 MW | 15 MW |
| Hebei Zhengding (Kangheng) power stationHebei · indirect | China | Waste | Operating | 28.3% | 4.2 MW | 15 MW |
| Liaoning Shenyang Tiexi District power stationLiaoning · indirect | China | Waste | Operating | 12.7% | 3.8 MW | 30 MW |
| Jiangxi Nanfeng (Kangheng) power stationJiangxi · indirect | China | Waste | Operating | 28.3% | 3.4 MW | 12 MW |
| Zhejiang Sanmen (Kangheng) power stationZhejiang · indirect | China | Waste | Operating | 28.3% | 3.4 MW | 12 MW |
| Hebei Daming (Kangheng) power stationHebei · indirect | China | Waste | Operating | 28.3% | 3.4 MW | 12 MW |
| Hunan Shaoyang (Kangheng) power stationHunan · indirect | China | Waste | Operating | 28.3% | 3.4 MW | 12 MW |
| Jiangxi Chongren (Kangheng) power stationJiangxi · indirect | China | Waste | Operating | 28.3% | 2.8 MW | 10 MW |
| Liaoning Donggang (Kangheng) power stationLiaoning · indirect | China | Waste | Operating | 13.6% | 1.6 MW | 12 MW |
| Guangdong Zhuhai power stationGuangdong · indirect | China | Waste | Operating | 0% | — | 90 MW |
| Nonthaburi (Shanghai SUS) power stationNonthaburi · indirect | Thailand | Waste | Under construction | 28.3% | — | 20 MW planned |
| Samarkand WtE power stationSamarqand · indirect | Uzbekistan | Waste | Under construction | 28.3% | — | 1.0 MW planned |
| Qashadaryo WtE power stationQashqadaryo · indirect | Uzbekistan | Waste | Under construction | 28.3% | — | 1.0 MW planned |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| Nonthaburi (Shanghai SUS) power station-- | Thailand | Waste | Under construction | — | 5.7 MW | 20 MW |
| Qashadaryo WtE power station-- | Uzbekistan | Waste | Under construction | 2026 | 0.3 MW | 1.0 MW |
| Samarkand WtE power station-- | Uzbekistan | Waste | Under construction | 2027 | 0.3 MW | 1.0 MW |
| Guangdong Zhuhai power station46082.0 | China | Waste | Pre-construction | — | 6.8 MW | 35 MW |
Facts
- Name
- SIIC Yangtze River Delta Ecological Development
- Full name
- SIIC Yangtze River Delta Ecological Development Co Ltd
- Local name
- 上实长三角生态发展有限公司
- Type
- Company
- Legal form
- Co Ltd
- Headquarters
- China
- Registered in
- China
- GEM entity ID
- E100000130414
Questions
How much power plant capacity does SIIC Yangtze River Delta Ecological Development own?
Weighted by its ownership share, SIIC Yangtze River Delta Ecological Development owns 96 MW of operating coal, oil and gas and bioenergy capacity at 18 plants in 1 countries. A further 13 MW is in development and 0.0 MW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is SIIC Yangtze River Delta Ecological Development’s largest power plant?
Zhejiang Ningbo Haishu District (Kangheng) power station in China is its largest holding by owned operating capacity (14 MW, a 28.3% share).
Who owns SIIC Yangtze River Delta Ecological Development?
Global Energy Monitor records no owner above SIIC Yangtze River Delta Ecological Development in this release.
Is SIIC Yangtze River Delta Ecological Development building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 13 MW, including 6.2 MW under construction.
Which fuels do SIIC Yangtze River Delta Ecological Development’s power plants use?
waste-to-energy 82%, bioenergy 18% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.