Electric Power Development
Electric Power Development Co Ltd
電源開発株式会社
- Owned operating capacity
- 14.2 GW
- Operating plants
- 38
- In development
- 530 MW
- Countries
- 5
- Global rank
- #104
Electric Power Development is recorded by Global Energy Monitor as a company headquartered in Japan, listed on a stock exchange. Counting direct and indirect stakes, its share of operating coal, oil and gas and bioenergy power plants comes to 14.2 GW at 38 plants in 5 countries, ranking #104 of 13,356 owners on this site. 64% of that is coal, followed by gas (36%). Its largest holding is J-POWER Tachibana-wan power station in Japan, where its share of 100% equals 2.1 GW. The biggest part is held through J-POWER North America Holdings (about 1.6 GW). A further 530 MW is under construction, in pre-construction or announced. The capacity-weighted average age of its operating capacity is 22 years.
Fleet at a glance
Owned capacity by status, fuel and country.
By status
- Operating14.2 GW48%
- Pre-construction530 MW2%
- Mothballed500 MW2%
- Retired2.3 GW8%
- Cancelled12.2 GW41%
Operating, by fuel
Operating, by country
Operating capacity by decade it started · average age 22 years
Map
38 operating plants with a stake held by Electric Power Development.
Compared with peers
Largest company owners in Japan, by owned operating capacity.
Ownership structure
Who owns Electric Power Development, and what it owns.
Owned by
- small shareholder(s) Unidentified owners76.9%
- The Master Trust Bank of Japan Company12.2%
- Custody Bank of Japan Company5.8%
- Nippon Life Insurance Company5.1%
Owns 18 companies
- Gemeng International Energy 8.6 GW operating7%
- Gulf JP 2.4 GW operating60%
- PT Bhimasena Power Indonesia 1.9 GW operating34%
- J-POWER North America Holdings 1.6 GW operating100%
- Gulf JP Nong Saeng 1.6 GW operating60%
- J-POWER Holdings (Thailand) 804 MW operating100%
- Kashima Power 645 MW operating50%
- J-POWER USA Investment Co 284 MW operating100%
- Osaki CoolGen 166 MW operating50%
- Omuta Recycle Power 21 MW operating33.3%
- Generating Electric 11 MW operating49%
- Birchwood Power Partners50%
- Clermont Coal Operations0%
- J-Power Australia100%
- J-POWER Vietnam100%
- Maules Creek Coal0%
- Narrabri Coal Joint Venture0%
- Yamaguchi Ube Power Generation90%
Power plants
42 plants with a stake, largest owned capacity first.
| Plant | Country | Fuel | Status | Owned share | Owned operating | Plant operating |
|---|---|---|---|---|---|---|
| J-POWER Tachibana-wan power stationTokushima | Japan | Coal | Operating | 100% | 2.1 GW | 2.1 GW |
| Matsuura J-POWER power stationNagasaki | Japan | Coal | Operating | 100% | 2.0 GW | 2.0 GW |
| Elwood Energy power stationIllinois · indirect | United States | Gas | Operating | 100% | 1.3 GW | 1.3 GW |
| Takehara power stationHiroshima | Japan | Coal | Operating | 100% | 1.3 GW | 1.3 GW |
| Isogo power stationKanagawa | Japan | Coal | Operating | 100% | 1.2 GW | 1.2 GW |
| U-Thai power stationPhra Nakhon Si Ayutthaya · indirect | Thailand | Gas | Operating | 60% | 960 MW | 1.6 GW |
| Nong Saeng power stationSaraburi · indirect | Thailand | Gas | Operating | 60% | 960 MW | 1.6 GW |
| Kaeng Khoi 2 power stationSaraburi · indirect | Thailand | Gas | Operating | 49% | 719 MW | 1.5 GW |
| Central Java Power ProjectJawa · indirect | Indonesia | Coal | Operating | 34% | 646 MW | 1.9 GW |
| Takasago power stationHyogo | Japan | Coal | Operating | 100% | 500 MW | 500 MW |
| Kashima Works power stationIbaraki · indirect | Japan | Coal | Operating | 50% | 323 MW | 645 MW |
| Ishikawa power stationOkinawa | Japan | Coal | Operating | 100% | 312 MW | 312 MW |
| Tenaska Westmoreland generating stationPennsylvania · indirect | United States | Gas | Operating | 25% | 284 MW | 1.1 GW |
| Tenaska Virginia generating stationVirginia · indirect | United States | Gas | Operating | 15% | 152 MW | 1.0 GW |
| Gulf KP1 & 2 power stationSaraburi · indirect | Thailand | Gas | Operating | 60% | 132 MW | 220 MW |
| Shanxi Zhaoguang power stationShanxi · indirect | China | Coal | Operating | 7% | 126 MW | 1.8 GW |
| Orange Grove peaking facilityCalifornia · indirect | United States | Gas | Operating | 100% | 118 MW | 118 MW |
| Osaki CoolGen ProjectHiroshima · indirect | Japan | Coal | Operating | 50% | 83 MW | 166 MW |
| Gulf NK2 power stationSaraburi · indirect | Thailand | Gas | Operating | 60% | 80 MW | 133 MW |
| Gulf CRN power stationPathum Thani · indirect | Thailand | Gas | Operating | 60% | 76 MW | 126 MW |
| Yuguang Coal power stationShanxi · indirect | China | Coal | Operating | 3.6% | 71 MW | 2.0 GW |
| Gulf TLC power stationSaraburi · indirect | Thailand | Gas | Operating | 60% | 68 MW | 114 MW |
| Chachoengsao NNK cogeneration power stationChachoengsao · indirect | Thailand | Gas | Operating | 60% | 66 MW | 110 MW |
| Shanxi Liulin power stationShanxi · indirect | China | Coal | Operating | 4% | 56 MW | 1.4 GW |
| Yangcheng power stationShanxi · indirect | China | Coal | Operating | 1.7% | 56 MW | 3.3 GW |
| Nong Khae power stationSaraburi · indirect | Thailand | Gas | Operating | 49% | 55 MW | 113 MW |
| Gulf NLL power stationRayong · indirect | Thailand | Gas | Operating | 21.8% | 55 MW | 250 MW |
| Shanxi Yuguang power stationShanxi · indirect | China | Coal | Operating | 4.2% | 55 MW | 1.3 GW |
| Shanxi Ruiguang power stationShanxi · indirect | China | Coal | Operating | 7% | 46 MW | 660 MW |
| High River power stationShanxi · indirect | China | Coal | Operating | 3.5% | 46 MW | 1.3 GW |
| Shanxi Hepo power stationShanxi · indirect | China | Coal | Operating | 6.5% | 46 MW | 700 MW |
| Pingshuo Gangue power stationShanxi · indirect | China | Coal | Operating | 4.7% | 28 MW | 600 MW |
| Lingshi Qiguang power stationShanxi · indirect | China | Coal | Operating | 3.6% | 25 MW | 700 MW |
| Jiexiu Chongguang power stationShanxi · indirect | China | Coal | Operating | 3.6% | 25 MW | 700 MW |
| EGCO cogeneration (Rayong) power stationRayong · indirect | Thailand | Gas | Operating | 20% | 23 MW | 117 MW |
| Youyu power stationShanxi · indirect | China | Coal | Operating | 3.4% | 23 MW | 660 MW |
| Yala power stationYala · indirect | Thailand | Biomass | Operating | 49% | 11 MW | 23 MW |
| Omuta Recycling power stationFukuoka · indirect | Japan | Waste | Operating | 33.3% | 6.9 MW | 21 MW |
| Matsushima power stationNagasaki | Japan | Coal | Mothballed | 100% | — | 1.5 GW planned |
| Isogo power station (original)Kanagawa | Japan | Coal | Retired | 100% | — | 530 MW planned |
| Birchwood Power FacilityVirginia · indirect | United States | Coal | Retired | 50% | — | 258 MW planned |
| Samutprakarn power stationSamut Prakan · indirect | Thailand | Gas | Retired | 49% | — | 220 MW planned |
Pipeline
Units under construction, in pre-construction or announced.
| Unit | Country | Fuel | Status | Planned start | Owned | Unit size |
|---|---|---|---|---|---|---|
| Matsushima power stationNew Unit 2 | Japan | Coal | Pre-construction | 2028 | 500 MW | 500 MW |
| Yangcheng power stationPhase III Unit 9 | China | Coal | Pre-construction | — | 15 MW | 1.0 GW |
| Yangcheng power stationPhase III Unit 10 | China | Coal | Pre-construction | — | 15 MW | 1.0 GW |
Facts
- Name
- Electric Power Development
- Full name
- Electric Power Development Co Ltd
- Local name
- 電源開発株式会社
- Other names
- J-POWER; Electric Power Development (J Power)
- Type
- Company
- Legal form
- Co Ltd
- Publicly listed
- Yes
- Headquarters
- Tôkyô [Tokyo], Japan
- Registered in
- Japan
- Website
- jpower.co.jp
- Legal Entity Identifier
- 549300KMHPUAQI8VEH90
- PermID
- 4295880748
- GEM entity ID
- E100000000641
Questions
How much power plant capacity does Electric Power Development own?
Weighted by its ownership share, Electric Power Development owns 14.2 GW of operating coal, oil and gas and bioenergy capacity at 38 plants in 5 countries. A further 530 MW is in development and 2.3 GW has been retired. Solar, wind, hydro, nuclear and geothermal plants are not covered by the ownership data.
What is Electric Power Development’s largest power plant?
J-POWER Tachibana-wan power station in Japan is its largest holding by owned operating capacity (2.1 GW, a 100% share).
Who owns Electric Power Development?
Global Energy Monitor records 4 direct owners: small shareholder(s) (76.9%); The Master Trust Bank of Japan (12.2%); Custody Bank of Japan (5.8%); Nippon Life Insurance (5.1%).
Is Electric Power Development building new power plants?
Yes. Its share of units under construction, in pre-construction or announced is 530 MW, including 0.0 MW under construction.
Which fuels do Electric Power Development’s power plants use?
coal 64%, gas 36%, bioenergy 0%, waste-to-energy 0% of its owned operating capacity.
How these numbers work. Global Energy Monitor links each coal, oil and gas and bioenergy unit to its direct owners, and each company to its own owners. This page follows every chain and multiplies the shares, so an owner with 50% of a company that owns 40% of a 1,000 MW unit is credited 200 MW. Shares GEM could not identify are left out, never guessed. Solar, wind, hydro, nuclear and geothermal plants are not in the ownership data.
Source: Global Energy Monitor, Global Energy Ownership Tracker, September 2026 (CC BY 4.0). Capacity is weighted by each owner’s share.